Home > Facilities / Equipment |
General Facilities |
1. Size of area : 6611.6 m2
2. Office Building : 419.8 m2 (3rd. floor complex)
3. Factory Building : 1983.5 m2
4. Address
4. (Old) 1238-5, Yeonsan-dong, Mokpo-si, Jeollanam-do,
4. (Old)SEOUL 530-370 Rep. of KOREA
4. (New) 73, Gongdanjungang-ro, Mokpo-si, Jeollanam-do,
4. (Old)SEOUL 530-370 Rep. of KOREA
|
Current Condition of Facilities |
1. FABRICATION
1. - Design : CAD / CAM
1. - Over Head Crane
1. - : 60Ton (1set)
1. - : 30Ton (2set)
1. - : 10/7.5Ton (2set)
1. - : 5ton (2set)
1. - CO2 Welding M/C (15set)
1. - Gouging M/C (2set)
2. Maching equipment
1. - Large size Lathe ©ª1000 x 10m (1set)
1. - Large size Lathe ©ª1000 x 6m (1set)
1. - Large size Lathe ©ª1000 x 5m (1set)
1. - Middle size Lathe ©ª580 x 2m (1set)
1. - Floor Boring M/C (1set)
1. - Radial Drilling M/C (1set)
1. - Drilling M/C (1set)
1. - Horizontality Milling M/C (1set)
1. - Verticality Milling M/C (1set)
3. Test Equipment
1. - Turnine Roller 100Ton (2set)
1. - Surface Plate (Ailgnment & Lattice, 2set)
4. BORING & CONTACT
1. - Portable Taper Boring M/C (2set)
1. - Level Block (70set)
1. - Porttable Level (9set)
1. - Pintle Contact Beam (5set)
1. - Hydro Pump (2set)
1. - Hydro Ram (36set)
1. - Contact Beam (2set)
5. VEHICLE
1. - Fork Lift (7Ton : 1set)
1. - Trailer (2.5Ton : 1set)
|
|
|
|
|
|
|
|
|
|
Manufacturing Shop |
|
Office |
|
Assembly / Test |
|
Fabrication |
|
|